The photograph above is of one of the greatest cantilever bridges -
The Forth Bridge.
The bridge was completed in 1964 and has a main span of 3,300 feet crossing
the River Forth in Scotland. The intentions for the bridge was that it would
carry a railway engine and carriages up to 260 metres from the nearest support
which at the time was quite an ambitious project.
From the image it is clear that the huge pillars take up the compression which
are held up by the narrow top members. Attached to these are the complicated
struts and cross bracing which withstand the forces causing buckling and twisting.
The outer cantilevers have counterweights at the ends to maintain balance.
The bridge was designed and built by Benjamin Baker in the late 1880's and was one of the first cantilever bridges to be constructed.